t:
+44 28 9099 2593
e: office@amkconsulting.co.uk
Civil Structural
Renewables
Access Platform, Larne Harbour, Co. Antrim
Client: Woodburn Engineering / McLaughlin & Harvey PLC
Structural design and analysis of remedial works access platform. The platform provided access for the contractor to repair a damaged fender at the P & O berth. Access to the work site was very limited, physically and also very limited in working time due to the location of the fender across a narrow walkway and tide and ferry docking times. The access solution permitted the working platform to be quickly installed and removed giving the repair crews the longest possible time carrying out the works.
Tower crane base, Stormont Parliment Buildings, Belfast
Client: Tracey Brothers Ltd.
Ballasted tower crane base on spread foundations. The tower crane was required as part of the re-roofing contract and was to be positioned as close as possible to the rear of Parliment Buildings to ensure it permitted access to as much of the roof as possible. Following assessment of the existing ground conditions and proximity to a basement wall and services, the base was placed within 600mm of the rear wall and cast at ground level to permit quick removal once the contract is complete.
Temporary Works, RNLI Stromness, Orkney Islands
Client: McLaughlin & Harvey PLC
Loading assessment of existing quay structures for craning of access platform and new RNLI pontoon. Lifting lugs for access platform, guide columns. Pontoon ballasting calculations.
Load Assessments, Portavogie Harbour, Co. Down
Client: McLaughlin & Harvey PLC
Loading assessment of existing quay structures for safe working of plant during remedial works on sheet piles.
Piling Platform, Port of Blyth, Northumberland
Client: McLaughlin & Harvey PLC
Piling platform design to enable safe working of piling plant & construction traffic for new warehouse building.
Reproduced under creative commons license:
Temporary Works, Waterfront Hall Extension, Belfast
Client: McLaughlin & Harvey PLC
Design of new piling platform, load assessment of existing quay structure to enable safe working of construction plant for the extension to the existing building. Assessment of existing and proposed site boundary hoardings.